February 25, 2024 – Construction continues throughout the site.
![P1010425](https://www.scs.edu/wp-content/uploads/2024/02/P1010425-1536x1153.jpg)
![P1010426](https://www.scs.edu/wp-content/uploads/2024/02/P1010426-1536x1153.jpg)
![P1010465](https://www.scs.edu/wp-content/uploads/2024/02/P1010465-1536x1153.jpg)
![P1010435](https://www.scs.edu/wp-content/uploads/2024/02/P1010435-1536x1153.jpg)
![P1010461](https://www.scs.edu/wp-content/uploads/2024/02/P1010461-1536x1153.jpg)
![P1010441](https://www.scs.edu/wp-content/uploads/2024/02/P1010441-1536x1153.jpg)
![P1010433](https://www.scs.edu/wp-content/uploads/2024/02/P1010433-1536x1153.jpg)
![P1010434](https://www.scs.edu/wp-content/uploads/2024/02/P1010434-1536x1153.jpg)
Previous
Next
February 18, 2024 – The Student Life Center is now fully sealed and insulation, wiring, and wallboard are continuing to be worked on throughout the site.
![P1010397](https://www.scs.edu/wp-content/uploads/2024/02/P1010397-1536x1153.jpg)
![P1010396](https://www.scs.edu/wp-content/uploads/2024/02/P1010396-1536x1153.jpg)
![default](https://www.scs.edu/wp-content/uploads/2024/02/DJI_0661-1536x1152.jpg)
![P1010403](https://www.scs.edu/wp-content/uploads/2024/02/P1010403-1536x1153.jpg)
![P1010401](https://www.scs.edu/wp-content/uploads/2024/02/P1010401-1536x1153.jpg)
![P1010398](https://www.scs.edu/wp-content/uploads/2024/02/P1010398-1536x1153.jpg)
Previous
Next
February 11, 2024 – The stairwell on the west side of the Student Life Center has been installed. Work is continuing on the insulation, drywall, and duct work throughout the property.