February 2024

February 2024

February 25, 2024 – Construction continues throughout the site.

February 18, 2024 – The Student Life Center is now fully sealed and insulation, wiring, and wallboard  are continuing to be worked on throughout the site.

February 11, 2024 – The stairwell on the west side of the Student Life Center has been installed. Work is continuing on the insulation, drywall, and duct work throughout the property.