News & Events | Relocation Effort | Photo Archive | November 2023
November 2023
November 26, 2023 – For the College Dormitory, the chapel windows have been sealed with a temporary enclosure and the electric is continuing to be installed. For the Student Life Center, the building has been wrapped except for the upper third, which includes the refectory and the auditorium, the roof has been covered with plywood except for the third floor, tar paper has been placed on the major section of the chapel area roofs, and ducts are beginning to be run. And for the upper parking lot, some of the walkways have been poured and trees along the berm are beginning to be planted.
November 18, 2023 – For the College Dormitory, windows have been installed, frames have been placed for the interior stained-glass windows, and electric wires have been run. For the Student Life Center, a plywood sub-structure is being placed on the chapel area, and a roofing frame is being placed above the refectory/auditorium area.
November 12, 2023 – For the College Dormitory, the building has been wrapped, sheets of pressed wood are being placed on the walls, and plumbing and wiring are beginning to be run. For the Student Life Center, plywood roofing has been placed on the main section of the chapel and pipes are beginning to be run. And on the perimeter of the campus, the road around Alexandria Hall has been laid out and cement bases and wiring have been placed for outdoor light posts.
November 1, 2023 – In the College Dormitory, boxes for electricity and internet have been installed and windows have arrived and are awaiting installation. For the Student Life Center, skeletal walls for the third floor and the chapel ceiling have gone up, and rounded window holders are in and are being placed.
We are planning to take much of our sacred art and artifacts from the Overbrook campus with us to our new campus in Lower Gwynedd, PA. However, we are simply unable to take all of our extensive collection of art and sacred objects with us. There remain many sacred and special items that we are making available for purchase. All of the proceeds from the sale of these items will help us to defray the substantial expenses to move to the new campus.